Engineering
MAP WORKSITES
- Construction of the Line 1 section: Sesto FS - Cinisello/Monza
- Line 2 station of Cologno Nord: redevelopment
- Construction of the Line 5 section: Garibaldi-Bignami
- Construction of the Line 5 section: Garibaldi-San Siro
- The Portello Project: a new motorway access
- SS 415 Paullese trunk road - lot 4: roadworks
- Extension of the LRT line 15 in Rozzano
- Cascina Gobba motorway connection - lot 2: redevelopment
- New road link between via Eritrea and via Castellammare
